WSSC Pre-Stressed Concrete Cylinder Pipe (PCCP) BOA
PEER was selected as a subcontractor to support the WSSC Pre-stressed Concrete Cylinder Pipe (PCCP) BOA program. These services include Coordination, Inspection, Condition Assessment, Recommendation, and Program Development activities. These activities include, but are not limited to, conducting a visual and sounding inspection of PCCP water transmission infrastructure, sonic/ultrasonic pulse-echo testing, related PCCP engineering services, forensic field investigation, and laboratory testing.
PEER is responsible for multiple tasks to be performed along multiple Water Main alignments in Prince George’s and Montgomery Counties. PEER participated in the walkover inspection for the 60” Adelphi Steel Water Transmission Main and was tasked with the elaboration and filing of necessary environmental and non-environmental permits for the potential addition of 11 more entry ports along this Water Main. Additionally, PEER was in charge of the elaboration of the construction drawings depicting all the surveyed features and plans for the respective permits and finally the construction of these enhancing features. PEER, was also responsible for the creation of Site Plans and Profiles for multiple pipe sections that required Replacement or CFRP Rehabilitation along the Potomac 48” Main Zone Pipeline, 42” Montgomery Village Avenue Pipeline, 36” Mid County Pipeline, 66” PCCP I-270 Gaithersburg Pipeline, 60” PCCP Montgomery High Zone, 66” & 72” PCCP MZ, 36” Dower House Road Pipeline, Leisure World 36” Pipeline, 36” NIST Water Transmission Main and 54” Prince George’s High Zone Water Transmission Main. In addition to Plan and Profiles, PEER also worked in obtaining the required permits to perform the necessary Rehabilitation/Replacement. Mr. Ricardo Martinez, our Director of Environmental Management, acted as the project manager for all activities, acquisition of permits, consultation with environmental scientists, agencies representatives, and interaction with our Prime to ensure the project was running smoothly.
Twenty-seven (27) tasks have been performed by PEER under this contract thus far.