WSSC General Wastewater Engineering Services

The Washington Suburban Sanitary Commission (WSSC) retained the professional services of PEER Consultants, P.C. (PEER) to perform sewer inspections and develop comprehensive strategies for rehabilitating deteriorating elements of the collection system, especially on large diameter and right-of-way sewers throughout Prince George’s and Montgomery Counties. The contract also requires the PEER team to address the aging wastewater infrastructure and develop strategies for rehabilitating deteriorating elements of the collection system. Thus far PEER has performed Fourteen (14) task orders under this BOA. These task orders can be found listed below.

  • Development of Standard Procedures for Inspecting Large Diameter Sanitary Sewers

  • 18-Inch Horsepen Force Main Contract No. 77CT 3241-B Pipeline Inspection & Condition Assessment

  • General Consulting Services

  • Emergency Response Plans for High-Risk Wastewater Collection System Assets

  • Flow Monitoring Network Analysis

  • Preventive Maintenance Optimization and Implementation

  • 16-Inch Reddy Branch Force Main Pipeline Inspection & Condition Assessment

  • WSSC Effectiveness of Maintenance Activities

  • Update of Sewer Analysis Inspection Review Manual

  • Collection System Performance Assessment Pilot

  • Wastewater Force Main Inspection Prioritization

  • Force Main Valve Inspection and Repair Pilot

  • Sewer Siphon Inspections and Cleaning Procedures

  • Large Diameter Gravity Sewer and Siphon Condition Assessment and Cleaning

Previous
Previous

Environmental Site Assessments

Next
Next

DC Water Asset Management Program