WSSC General Wastewater Engineering Services
The Washington Suburban Sanitary Commission (WSSC) retained the professional services of PEER Consultants, P.C. (PEER) to perform sewer inspections and develop comprehensive strategies for rehabilitating deteriorating elements of the collection system, especially on large diameter and right-of-way sewers throughout Prince George’s and Montgomery Counties. The contract also requires the PEER team to address the aging wastewater infrastructure and develop strategies for rehabilitating deteriorating elements of the collection system. Thus far PEER has performed Fourteen (14) task orders under this BOA. These task orders can be found listed below.
Development of Standard Procedures for Inspecting Large Diameter Sanitary Sewers
18-Inch Horsepen Force Main Contract No. 77CT 3241-B Pipeline Inspection & Condition Assessment
General Consulting Services
Emergency Response Plans for High-Risk Wastewater Collection System Assets
Flow Monitoring Network Analysis
Preventive Maintenance Optimization and Implementation
16-Inch Reddy Branch Force Main Pipeline Inspection & Condition Assessment
WSSC Effectiveness of Maintenance Activities
Update of Sewer Analysis Inspection Review Manual
Collection System Performance Assessment Pilot
Wastewater Force Main Inspection Prioritization
Force Main Valve Inspection and Repair Pilot
Sewer Siphon Inspections and Cleaning Procedures
Large Diameter Gravity Sewer and Siphon Condition Assessment and Cleaning